TMC LAB CNAS L8364 CMA 202119015835 Report Verification
TMC Forum
Industry Compliance

Our exoskeleton passed safety and EMC — why do the skin-contact metal parts still need their own sweat and body-worn ESD testing?

A machine can clear safety, EMC and radio testing and still fail on its skin-contact metal parts: sweat/salt-spray corrosion and body-worn ESD are separate verdicts, not something the whole-unit report implies.

8 分钟读完 Industry Compliance
3 浏览

In exoskeleton and wearable-robot projects, a client often arrives with a full stack of reports: safety, EMC and Wi-Fi radio all passed. Yet an overseas customer or tender review still holds the shipment — the sweat/salt-spray and body-worn ESD behaviour of the few metal parts touching the skin was never tested. If the whole machine passed, why test a handful of small metal pieces separately? In the eyes of the standard, a skin-contact part is not a spare component; it is an independent item of judgement.

Why a whole-machine pass is not enough

Enclosures and circuitry are checked for insulation, shock protection and immunity. Skin-contact parts face another environment: sweat contains salts and mild acids that attack plating; static built up in movement discharges through the metal points touching the body; friction, body heat and cleaning add stress. None of this appears in routine machine testing. The verdict looks at how reachable metal and plating touching the skin behave under combined sweat, salt spray and static, with composition, spray conditions and ESD levels set by the technical agreement.

How skin-contact parts are judged

Two groups. Corrosion resistance: skin-contact metal parts are sampled alone, exposed to combined artificial sweat and salt spray, then checked for blistering, discolouration or rust — the plating itself is judged, not the machine. Electrostatic immunity: because the device is worn, ESD follows the contact-discharge approach of IEC 61000-4-2 at reachable skin-contact points, checking for lock-ups, resets, data corruption or temporary loss of function. Different samples, stresses and pass criteria — one machine report cannot replace either.

Dimension Routine whole-machine test Skin-contact part testing
Item judged Machine enclosure and circuitry Reachable metal parts and plating that touch the skin
Corrosion stress General salt spray or enclosure ingress Combined artificial sweat and salt spray
ESD basis General environmental level IEC 61000-4-2 contact discharge at skin-contact points
Relationship Machine passes A machine pass does not replace the skin-contact verdict

Recurring pitfalls

  • Only whole-machine salt spray or ingress testing, with no separate sampling of skin-contact metal parts.
  • Plain neutral salt spray instead of artificial sweat, missing the salts and mild acids that attack plating.
  • Air discharge only, omitting contact discharge at reachable skin-contact points.
  • Changing the plating or metal-part supplier without retesting, so production units no longer match the sample.
  • Treating a wearable as a handheld device with a general environmental level, not one set for worn use (per the technical agreement).

Conclusion

A skin-contact part is not a free extra in the whole-machine report; it has its own sampling, stresses and pass criteria. Put the skin-contact metal-part list, sweat/salt-spray conditions and IEC 61000-4-2 contact-discharge level into the requirements at project start, rather than discovering the gap before review. We have long served leading domestic vehicle manufacturers and their supplier networks, and testing and certification follow the route appropriate to each product category. Define the skin-contact boundary and use scenario early, and the machine-passes-but-parts-stall rework is usually avoided.

TMC Maike Testing | CNAS Accredited Laboratory (L8364) | CMA Accreditation
Shenzhen Bao’an + Dongguan dual bases · 10000 sqm laboratory | Serving 100+ countries worldwide
13510907826 | cert@tmc-lab.com

文中涉及的测试项目均可委托 TMC LAB 执行。把产品和目标市场发给我们,可得到针对性的测试清单。

返回内容中心

标准看得懂,项目才做得对

把标准号和产品发给我们,技术顾问用工程语言讲清楚要做哪几项、为什么。

Discussion

读者评论 0

还没有评论,来说两句吧。

发表评论

Call